Link to DEM Home Page Link to State of RI web site RIDEM graphical banner, showing land and water scene
Navigation button, HomeNavigation button, ProgramsNavigation button, TopicsNavigation button, MapsNavigation button, PublicationsNavigation button, NewsNavigation button, EventsNavigation button, SearchNavigation button, HelpNavigation button, Contact
Home > Programs > Bureau of Environmental Protection > Air Resources > Preconstruction Permit Listings


APC Regulation No. 9 -
APC Permits


Application Forms

BACT/LAER Information

CARB/CAPCOA Clearinghouse

NJDEP's
State-of-the-Art (SOTA) manuals


EPA's Clearinghouse

South Coast AQMD Guidelines

Texas NRCC Guidelines

Bay Area AQMD Guidelines

San Joaquin Valley Unified APCD Guidelines

Performance Standards for Existing Stationary Sources

State/Local Air Pollution Control Agency Links
 
Preconstruction Permits
Permits Issued Prior to September 2002
Numerical Listing
This document is a list of all preconstruction permits issued under Air Pollution Control Regulation No. 9 since the program's inception in November 1971. The list is organized by Approval No. from the first permit issued in November 1971 to the last permit issued in August 2002.
Alphabetical Listing
This document is a list of all preconstruction permits issued under Air Pollution Control Regulation No. 9 since the program's inception in November 1971. The list is organized alphabetically by Company Name and includes all permits issued from November 1971 through August 2002.
Major Source Permit Listing
This document is a list of all preconstruction permits issued under Air Pollution Control Regulation No. 9 for new major sources or major modifications to existing major sources.
Permits Issued Since September 2002
Women & Infants Hospital
Providence
Approval No. GPEG-4
Issued 4/28/08
Installation of a 2922 HP emergency generator.
Miriam Hospital
Providence
Approval Nos. 2027-2029
Issued 4/15/08
Installation of two 1501 HP and one 2151 HP emergency generators.
Carnegie Tower Development Company
Portsmouth
Approval No. 2026
Issued 4/8/08
Installation of a 918 HP emergency generator.
Wood Precision
East Providence
Approval No. 2025
Issued 3/21/08
Installation of a spray booth for wood coating operations.
Toray Plastics (America), Inc.
North Kingstown
Approval No. TPFOB-1
Issued 3/14/08
Temporary permit for a fuel oil fired boiler.
J.H. Lynch & Sons, Inc.
Cumberland
Approval No. 2024
Issued 3/3/08
Approval to burn alternative fuels.
Immunex Rhode Island Corp.
West Greenwich
Approval No. 2023
Issued 3/3/08
Installation of a packed bed scrubber.
Narragansett Bay Commission
Providence
Approval No. 2022
Issued 2/19/08
Installation of a 1114 HP emergency generator.
T. Miozzi, Inc.
Coventry
Approval No. 2021
Issued 2/8/08
Approval to burn alternative fuels.
Vishay Electrofilms
Warwick
Approval No. 2020
Issued 1/28/08
Installation of a packed bed scrubber.
The Westin Hotel
Providence
Approval No. 2019
Issued 1/10/08
Installation of a 1114 HP emergency generator
Univar USA, Incorporated
Providence
Approval No. 2018
Issued 12/21/07
Installation of a packed bed scrubber.
Raytheon Company
Portsmouth
Approval No. GPEG-3
Issued 12/7/07
Installation of a 158 HP emergency generator.
Pawtucket Asphalt Company
Pawtucket
Approval No. 2016-2017
Issued 12/4/07
Installation of a 300 ton/hour drum mix asphalt plant.
Rhode Island Textile Company
Pawtucket
Approval No. 2015
Issued 11/29/07
Installation of a 28 shoelace tipping machines.
J.H. Lynch & Sons, Inc.
Peacedale
Approval No. 2014
Issued 11/16/07
Approval to burn alternative fuels.
Foster Glocester Regional School District
North Scituate
Approval No. 2012-2013
Issued 11/16/07
Installation of a 9.1 MMBTU/hr wood-fired boiler.
Millwork One, Inc.
Cranston
Approval No. 2011
Issued 11/9/07
Installation of a spray booth for wood coating operations.
Umicore Indium Products
Providence
Approval No. GPEG-2
Issued 10/22/07
Installation of a 94.5 HP emergency generator.
Fidelity Investments, Inc.
Smithfield
Approval No. GPEG-1
Issued 9/7/07
Installation of a 779 HP emergency generator.
American Power Conversion Corporation
West Kingston
Approval No. 2008-2010
Issued 8/31/07
Installation of three 2593 HP diesel generators.
Champlin's Marina & Resort, Inc.
Block Island
Approval No. 2007
Issued 8/31/07
Installation of a 1081 HP diesel generator.
Dunkin Donuts Center
Providence
Approval No. 2006
Issued 8/30/07
Installation of a 2205 HP emergency generator.
Foam Technology
Lincoln
Approval No. 2005
Issued 8/29/07
Installation of a 6.3 MMBTU/hr boiler.
Middletown Public School Department
Middletown
Approval No. 2004
Issued 8/7/07
Installation of a 779 HP emergency generator.
Fidelity Investments, Inc.
Smithfield
Approval No. 2000-2003
Issued 8/1/07
Installation of four 2937 HP emergency generators.
Jolly Gardener Products
Wyoming
Approval No. 1998-1999
Issued 8/1/07
Installation of two tub grinders.
Waterplace Park
Providence
Approval No. 1997
Issued 7/26/07
Installation of a 1502 HP emergency generator.
Admiral Packaging, Inc.
Providence
Approval No. 1996
Issued 7/26/07
Installation of a 10-color flexographic printing press.
Motiva Enterprises, LLC
Providence
Approval No. 1994-1995
Issued 7/10/07
Instaalation of two vapor combustion units.
Southeastern New England Shipbuilding Company
North Kingstown
Approval No. 1991-1993
Issued 7/3/07
Installation of a ship building and ship repair facility.
Foster-Glocester Regional School District
Glocester
Approval No. 1989-1990
Issued 6/5/07
Installation of a 4.56 MMBTU/hr wood-fired boiler.
Raytheon Company
Portsmouth
Approval No. 1988
Issued 6/5/07
Installation of a 5.2 MMBTU/hr boiler.
J.H. Lynch & Sons, Inc.
East Providence
Approval No. 1987
Issued 5/4/07
Approval to burn alternative fuels.
Cooley Group, Inc.
Pawtucket
Approval No. 1986
Issued 5/3/07
Installation of a new regenerative thermal oxidizer.
Factory Mutual Insurance Company
Johnston
Approval Nos. 1984-1985
Issued 5/3/07
Installation of two 2206 HP emergency generators.
Alexion Pharmaceuticals, Inc.
Smithfield
Approval No. 1983
Issued 5/3/07
Installation of a 2935 HP emergency generator.
St. Lawrence Cement, LLC
Providence
Approval No. 1974-1982
Issued 4/11/07
Installation of a barge mounted pneumatic ship unloader.
Cardi Materials, LLC
Warwick
Approval No. 1973
Issued 4/11/07
Installation of a baghouse.
Coventry Asphalt, LLC
Coventry
Approval No. 1972
Issued 4/11/07
Installation of a baghouse.
T. Miozzi, Inc.
Coventry
Approval No. 1971
Issued 4/11/07
Installation of a baghouse.
Immunex Rhode Island Corp.
West Greenwich
Approval No. 1970
Issued 4/4/07
Installation of a 744 HP emergency generator.
ShawCor Pipe Protection, LLC
North Kingstown
Approval No. 1969
Issued 3/27/07
Installation of a temporary concrete coating plant.
Murdock Webbing Co., Inc.
Central Falls
Approval No. 1968
Issued 3/23/07
Installation of a 16.7 MMBTU/hr boiler.
Arkwright, Incorporated
Fiskeville
Approval No. 1967
Issued 3/9/07
Installation of a cartridge filter.
Final Gift Pet Cremation Services
Cranston
Approval No. 1965-1966
Issued 2/22/07
Installation of two animal crematories.
Western Hills Crematory
Cranston
Approval No. 1963-1964
Issued 2/22/07
Installation of two human crematories.
MetLife Insurance Company
Warwick
Approval No. 1962
Issued 2/22/07
Installation of a 2885 HP emergency generator.
American Power Conversion Corporation
West Kingston
Approval No. 1961
Issued 2/20/07
Installation of a 1490 HP emergency generator.
Block Island Power Co.
New Shoreham
Approval No. 1959-1960
Issued 2/9/07
Installation of new selective catalytic reduction systems for Engine Nos. 22 and 23.
Admiral Packaging, Inc.
Providence
Approval No. 1958
Issued 2/9/07
Installation of a regenrative thermal oxidizer.
Raytheon Company
Portsmouth
Approval No. 1956-1957
Issued 2/9/07
Installation of an 8.2 MMBTU/hr and an 8.4 MMBTU/hr boiler.
Brown University
Providence
Approval No. 1955
Issued 1/31/07
Installation of a temporary boiler.
GTECH Corp.
West Greenwich
Approval No. 1953-1954
Issued 1/8/07
Installation of a 749 HP and a 2836 HP emergency generator.
Brown University
Providence
Approval No. 1951-1952
Issued 12/1/06
Installation of two temporary boilers.
Umicore Indium Products
Providence
Approval No. 1950
Issued 12/1/06
Installation of a packed bed scrubber.
Stanley Fastening Systems
East Greenwich
Approval No. 1925-1949
Issued 11/22/06
Installation of twenty-five nail coating machines.
Bradford Dyeing Association
Bradford
Approval No. 1922-1924
Issued 11/9/06
Installation of a tenter frame and two Smoke Abaters.
Kenyon Industries, Inc.
Shannock
Approval No. 1921
Issued 10/24/06
Installation of a regenerative thermal oxidizer.
Lincoln Park Raceway
Lincoln
Approval No. 1914-1920
Issued 10/2/06
Installation of three boilers (11.2 MMBTU/hr each) and four emergency generators (3-2155 HP, 1-1502 HP).
Clariant Corporation
Coventry
Approval No. 1913
Issued 9/29/06
Site Remediation Activities
Paws at Rest
Cranston
Approval No. 1912
Issued 9/18/06
Installation of an animal crematory.
Advanced Chemical Company
Warwick
Approval No. 1910-1911
Issued 9/12/06
Installation of two dust collectors.
Toray Plastics (America),Inc.
North Kingstown
Approval No. 1908-1909
Issued 9/8/06
Installation of a two gravure coaters.
Saint-Gobain Performance Plastics, Inc.
Bristol
Approval No. 1901-1907
Issued 8/11/06
Installation of process and ancillary equipment to add a commercial production line for the production of Meldin 7000®
Pawtucket Water Supply Board
Pawtucket
Approval No. 1898-1900
Issued 7/27/06
Installation of two 2668 HP and one 986 HP emergency generators.
Bunge Oils, Inc.
Pawtucket
Approval No. 1897
Issued 7/26/06
Installation of a 27.9 MMBTU/hr boiler.
T. Miozzi, Inc.
Coventry
Approval No. 1895-1896
Issued 6/27/06
Installation of a new drum mix asphalt plant
Robin Rug/Russ-Russ Realty
Bristol
Approval No. 1894
Issued 6/26/06
Installation of a 6.3 MMBTU/hr boiler fired with No. 4 fuel oil.
Aspen Aerogels, Inc.
East Providence
Approval No. 1890-1893
Issued 6/26/06
Construction of a facility to produce aerogel insulation materials.
Block Island Power Co.
New Shoreham
Approval No. 1889
Issued 6/13/06
Installation of a new selective catalytic reduction system to control NOx emissions.
C&C Fiberglass Components, Inc.
Bristol
Approval No. 1888
Issued 5/30/06
Construction of a fiberglass products manufacturing facility.
US Real Estate, LP
Providence
Approval No. 1887
Issued 5/15/06
Installation of a 896 HP emergency generator.
T. Miozzi, Inc.
Block Island
Approval No. 1885-1886
Issued 3/10/06
Installation of temporary drum mix asphalt plant.
Western Hills Crematory
Cranston
Approval No. 1884
Issued 3/6/06
Installation of a crematory.
Bullard Abrasives
Lincoln
Approval No. 1883
Issued 2/27/06
Installation of resin processing equipment.
Electric Boat Corporation
North Kingstown
Approval No. 1882
Issued 2/16/06
Construction of Building 2009.
Kent County Water Authority
Scituate
Approval No. 1881
Issued 2/1/06
Installation of an emergency generator.
Motiva Enterprises, LLC
Providence
Approval Nos. 1875-1880
Issued 1/25/06
Modifications to the bulk gasoline terminal to allow the processing and distribution of ethanol
Soluol, Inc.
East Providence
Approval Nos. 1871-1874
Issued 1/20/06
Installation of process and air pollution control equipment for the production of resins, coatings, adhesives and other specialty materials.
Providence Soils, LLC
Providence
Approval No. 1870
Issued 12/22/05
Installation of a packed bed scrubber.
TE Products Pipeline Company, LP
Providence
Approval No. 1869
Issued 11/21/05
Installation of a flare.
Carpenter-Jenks Family Funeral Homes, Inc.
West Warwick
Approval No. 1868
Issued 9/19/05
Installation of a crematory.
City of Warwick
Warwick
Approval No. 1867
Issued 9/14/05
Installation of a compost grinder.
MetLife Insurance Co.
West Warwick
Approval No. 1861
Issued 6/27/05
Installation of an emergency generator.
Precision Park Partners, LLC
East Providence
Approval Nos. 1864-1865
Issued 8/16/05
Installation of two emergency generators.
Amica Mutual Insurance Company
Lincoln
Approval Nos. 1862-1863
Issued 6/30/05
Installation of two emergency generators.
MetLife Insurance Co.
West Warwick
Approval No. 1861
Issued 6/27/05
Installation of an emergency generator.
Brown University
Providence
Approval No. 1860
Issued 6/23/05
Installation of an emergency generator.
Block Island Power Co.
New Shoreham
Approval Nos. 1858-1859
Issued 6/23/05
Installation of an engine-generator set and a selective catalytic reduction system to control NOx emissions.
Smithfield Peat Company, Inc.
Smithfield
Approval No. 1857
Issued 6/10/05
Installation of an engine-generator set to power a crushing plant.
The Slater Companies
Pawtucket
Approval Nos. 1855-1856
Issued 6/10/05
Installation of a 130" Babcock Tenter frame and an Alden Air Systems Aero-Flame Thermal Oxidizer.
Citizens Bank of Rhode Island
East Providence
Approval Nos. 1850-1854
Issued 6/6/05
Installation of five emergency generators.
Citizens Bank of Rhode Island
Warwick
Approval Nos. 1848-1849
Issued 6/6/05
Installation of two emergency generators.
Citizens Bank of Rhode Island
Cranston
Approval No. 1847
Issued 6/6/05
Installation of an emergency generator.
Providence Soils, LLC
East Providence
Approval No. 1846
Issued 5/11/05
Installation of a packed bed scrubber to treat odors generated from sewage sludge dewatering and handling operations.
Citizens Financial Group
Smithfield
Approval No. 1845
Issued 5/3/05
Installation of an emergency generator.
Motiva Enterprises, LLC
Providence
Approval No. 1843-1844
Issued 5/3/05
Conversion of two tanks to allow storage of gasoline and petroleum liquids of lesser vapor pressure.
Toray Plastics (America), Inc.
North Kingstown
Approval No. 1842
Issued 4/19/05
Installation of a temporary boiler.
Rhode Island Resource Recovery Corporation
Johnston
Approval No. 1838-1841
Issued 4/15/05
Installation of two compost grinders, one RecoverMat grinder and a trommel screener.
City of Woonsocket
Woonsocket
Approval No. 1837
Issued 4/6/05
Installation of a packed bed scrubber to control odors.
Bradford Dyeing Association
Bradford
Approval No. 1835-1836
Issued 3/21/05
Installation of a Smoke Abater.
P.J. Keating Company
Cranston
Approval No. 1832-1834
Issued 3/8/05
Installation of a new drum mix asphalt plant.
Hudson Terminal Corp.
Providence
Approval No. 1830-1831
Issued 3/8/05
Installation of two hot oil heaters.
Brookwood Laminating, Inc.
Peacedale
Approval No. 1827
Issued 2/25/05
Installation of a new fabric coating line.
City of Woonsocket
Woonsocket
Approval No. 1823-1824
Issued 2/21/05
Installation of a fluidized bed combustor for sewage sludge and a variable throat venturi/impingement tray scrubbing system.
Women & Infants Hospital of RI
Providence
Approval No. 1822
Issued 1/27/05
Installation of a temporary 2593 HP emergency generator.
Victory Finishing Technologies, Inc.
Providence
Approval No. 1821
Issued 11/18/04
Installation of a 12.6 MMBTU/hr boiler fired with natural gas or No. 2 fuel oil.
Roger Williams Medical Center
Providence
Approval No. 1820
Issued 11/18/04
Installation of a 24.5 MMBTU/hr boiler fired with natural gas or No. 6 fuel oil.
Roger Williams Medical Center
Providence
Approval No. 1819
Issued 11/3/04, Last revised 12/10/04
Installation of a temporary boiler.
City of Cranston
Cranston
Approval No. 1818
Issued 11/10/04
Replacement and/or modifications to the air pollution control systems for the two sewage sludge incinerators.
Adlife Printing LLC
North Kingstown
Approval No. 1815-1817
Issued 10/20/04
Installation of two heatset web offset lithographic presses and a regenerative thermal oxidizer.
Final Gift Pet Cremation Services, Inc.
Cranston
Approval No. 1813-1814
Issued 10/12/04
Installation of two animal crematories.
Stanley Fastening Systems
North Kingstown
Approval No. 1811-1812
Issued 9/20/04
Installation of a zinc plating line and packed bed scrubber.
Rhode Island Resource Recovery Corporation
Johnston
Approval No. 1810
Issued 9/16/04
Construction of the Phase V landfill.
Kent County Memorial Hospital, Inc.
Warwick
Approval No. 1809
Issued 8/3/04
Installation of an emergency generator.
City of Warwick
Warwick
Approval No. 1808
Issued 7/20/04
Installation of an emergency generator.
P.J. Keating Company
Cranston
Approval No. 1807
Issued 7/20/04
Approval to burn alternative fuels.
Brookwood Laminating
Peacedale
Approval No. 1806
Issued 7/6/04
Installation of a regenerative thermal oxidizer.
Bunge North America (East), Inc.
Pawtucket
Approval No. 1805
Issued 6/21/04
Installation of a temporary boiler not to exceed 13.4 MMBTU/hr capacity.
Bradford Dyeing Association
Bradford
Approval No. 1804
Issued 6/7/04
Installation of a 21.3 MMBTU/hr boiler fired with No. 6 fuel oil.
Pliant Corporation
Harrisville
Approval No. 1803
Issed 5/18/04
Installation of a 4.2 MMBTU/hr boiler fired with No. 4 fuel oil.
Naval Station Newport
Newport
Approval No. 1801-1802
Issued 5/6/04
Installation of two, temporary 18.1 MMBTU/hr boilers fired with natural gas.
Coim USA
North Kingstown
Approval No. 1800
Issued 5/3/03
Installation of a laminator.
Brown University
Providence
Approval No. 1799
Issued 4/12/04
Installation of an emergency diesel generator.
Fidelity Investments, Inc.
Smithfield
Approval No. 1797-1798
Issued 4/12/04
Installation of two emergency diesel generators.
P.J. Keating Company
Cranston
Approval No. 1796
Issued 4/12/04
Installation of a baghouse to control emissions from the existing asphalt plant.
Honeywell Sensing & Control
Woonsocket
Approval No. 1795
Issued 4/6/04
Installation of two production lines relocated from the Pawtucket facility.
Immunex Rhode Island Corp.
West Greenwich
Approval No. 1793-1794
Issued 3/19/04
Installation of two, temporary 2628 HP emergency diesel generators.
Bradford Dyeing Association, Inc.
Westerly
Approval No. 1792
Issued 3/16/04
Installation of a Smoke Abater.
Providence College
Providence
Approval No. 1789-1791
Issued 3/8/04
Installation of three new 9.5 MMBTU/hr boilers.
Tiyoda-Serec Corp.
East Providence
Approval No. 1788
Issued 2/12/04
Installation of a vapor degreaser.
Teknor Apex Company
Pawtucket
Approval No. 1787
Issued 2/12/04, Last Revised 4/30/04
Installation of a Buss Kneader and a Buss Single-Screw Extruder.
Arkwright, Inc.
Fiskeville
Approval No. 1786
Issued 2/3/04
Installation of a regenerative thermal oxidizer.
Induplate, Inc.
North Providence
Approval No. 1785
Issued 1/23/04
Installation of a 10.4 MMBTU/hr boiler.
B & D Plastics
Johnston
Approval No. 1784
Issued 1/13/04
Installation of an 8-color flexographic printing press.
US Watercraft, LLC
Portsmouth
Approval No. 1783
Issued 1/13/04, Last revised 4/6/05
Fiberglass boat manufacturing facility.
Naval Station Newport
Newport
Approval No. 1779-1782
Issued 1/13/04, Last Revised 2/13/04
Installation of three 16.75 MMBTU/boilers, one 5.1 MMBTU/hr boiler and various small fuel burning devices.
MMF Realty
Warren
Approval No. 1778
Issued 12/17/03
Installation of a 6 MMBTU/hr boiler.
Rhode Island Hospital
Providence
Approval No. 1777
Issued 10/21/03
Installation of a 89 MMBTU/hr boiler.
Strawberry Field Estates, Inc.
Warwick
Approval No. 1776
Issued 10/14/03
Site remediation activities at 333 Strawberry Field Road.
Ridgewood Rhode Island Generation, LLC
Johnston
Approval No. 1774-1775
Issued 9/16/03
Installation of two 1735 HP engine-generator sets to burn landfill gas.
Herff-Jones, Inc.
Warwick
Approval No. 1761-1773
Issued 9/10/03
Installation of decorative chromium electroplating equipment, two vapor degreasers and eight casting ovens.
Hindley Mfg. Co.
Cumberland
Approval No. 1760
Issued 9/3/03
Installation of a 5.2 MMBTU/hr boiler.
Clariant Corporation
Coventry
Approval No. 1759
Issued 7/16/03
Installation of an acid mist eliminator in series with an existing scrubber system (A-scrubber).
The Westerly Hospital
Westerly
Approval No. 1758
Issued 7/08/03
Installation of a 1801 HP emergency, diesel fired engine-generator set.
New England Container Co.
Smithfield
Approval No. 1757
Issued 6/25/03
Installation of a replacement baghouse for the drum furnace.
Waste Management of RI
Warwick
Approval No. 1756
Issued 6/24/03, Last revised 10/21/03
Installation of an 880 HP diesel fired engine to power a Compost Grinder. The engine is to replace the 750 HP engine in Approval No. 1716.
Fortune Metal, Inc.
Lincoln
Approval No. 1752-1755
Issued 5/30/03
Installation of a wire reclamation furnace and three baghouses.
J.H. Lynch & Sons
East Providence
Approval No. 1751
Issued 5/30/03
Installation of a baghouse on the existing asphalt plant.
South County Hospital
Wakefield
Approval No. 1749-1750
Issued 5/23/03
Installation of an 1180 HP emergency generator and an 8.2 MMBTU/hr boiler.
Rhode Island Hospital
Providence
Approval No. 1748
Issued 5/16/03
Installation of a 1502 HP emergency generator.
Teknor Apex Company
Pawtucket
Approval No. 1745 & 1746
Issued 3/18/03
Installation of a cone calorimeter and scrubber.
Microfibres, Inc.
Pawtucket
Approval No. 1744
Issued 3/18/03
Installation of a 9.8 MMBTU/hr boiler.
D'Ambra Construction Co., Inc.
Warwick
Approval No. 1743
Issued 2/24/03
Installation of a baghouse.
Toray Plastics (America), Inc.
North Kingstown
Approval No. 1740-1742
Issued 2/6/03, Last revised 4/21/05
Modification of three polyester film lines to apply coatings.
Kenyon Industries, Inc.
Shannock
Approval No. 1738-1739
Issued 2/6/03, Last revised 2/21/05
Installation of a fabric coating line and a thermal oxidizer.
St. Mary Academy-Bay View
East Providence
Approval No. 1736-1737
Issued 1/8/03
Installation of two 6.3 MMBTU/hr boilers.
Immunex Rhode Island Corp., Inc.
West Greenwich
Approval No. 1734-1735
Issued 12/20/02
Installation of two temporary emergency generators.
Impco, Inc.
East Providence
Approval No. 1733
Issued 12/16/02
Installation of a vapor degreaser.
Umicore Indium Products
Providence
Approval No. 1728-32
Issued 12/6/02
Installation of five gas-fired, metal melt pots.
CCL Custom Mfg., Inc.
Cumberland
Approval No. 1727
Issued 11/26/02
Installation of an aerosol can filling line.
FM Global
Glocester
Approval Nos. 1722-1726
Issued 10/25/02, Last revised 3/21/05
Installation of an air pollution control system consisting of two identical parallel trains each with a horizontal inlet quench chamber followed by a wet electrostatic precipitator with dual inlet cyclone modules to control emissions from fire research activities and installation of three 8.54 MMBtu/hr boilers.
Smithfield Peat Company
Smithfield
Approval Nos. 1718-1721
Issued: 9/26/02
Installation of an 750 HP diesel fired engine to power a CBI wood grinder, a 800 HP diesel fired engine to power a CBI Mulch King, an 1000 HP diesel fired engine to power a CBI Magnum Mulcher and a 890 HP diesel fired engine to power a Nordberg crusher.
Patriot Hauling Co., Inc.
Johnston
Approval No. 1717
Issued 9/26/02
Installation of a 1204 HP diesel fired engine to power a jawcrusher, screener and cone.
Waste Management of RI
Warwick
Approval No. 1716
Issued 9/26/02
Installation of a 750 HP diesel fired engine to power a Compost Grinder.
RI Resource Recovery Corp.
Johnston
Approval Nos. 1712-1715
Issued: 9/26/02
Installation of an 800 HP diesel fired engine to power a Compost Grinder, a 650 HP diesel fired engine to power a Compost Grinder, an 880 HP diesel fired engine to power a grinder for construction and demolition waste and a 750 HP diesel fired engine to power a grinder for construction and demolition waste.
Riverpoint Lace Works, Inc.
West Warwick
Approval No. 1711
Issued: 9/26/02
Installation of a 27.4 MMBTU/hr boiler to be fired with natural gas and 0.5% sulfur residual fuel oil.
AT&T Local Network Services
Providence
Approval No. 1710
Issued 9/10/02
Installation of a 765 HP emergency, diesel fired, engine generator set.
Clariant Corp.
Coventry
Approval No. 1709
Issued 9/5/02
Installation of a 1232 HP emergency, diesel fired, engine generator set.

For General Information 222-6800 • After Hours Emergencies 222-3070 • Disclaimer
rev. 5/12/08