Link to DEM Home Page Link to State of RI web site RIDEM graphical banner, showing land and water scene
Navigation button, HomeNavigation button, ProgramsNavigation button, TopicsNavigation button, MapsNavigation button, PublicationsNavigation button, NewsNavigation button, EventsNavigation button, SearchNavigation button, HelpNavigation button, Contact
Home > Programs > Bureau of Environmental Protection > Office of Water Resources > Permitting > Onsite Wastewater Treatment Systems


OWTS Search Icon and Link
OWTS Permit Search
(after 1990)

OWTS Permit Search (before 1990)

Subscribe to OWTSINFO
E-Mail List


Cesspool Phaseout

Rules and Policies

Professional Licensing Program

Maintaining Your OWTS

Alternative and Experimental Technologies

Contacts

Permit Tolling Page


 
Onsite Wastewater Treatment Systems
ISDS icon image
Updated: OWTS Repair Guidance in Critical Erosion Areas
Westerly Meeting Handout

E-Mail Notification Service Available


Permitting activities are divided into three main stages: site-suitability, design review, and construction inspection. Site-suitability is a preliminary stage which assesses the suitability of a parcel of property for on-site sewage disposal. Design review entails a review to determine a design's compliance with State standards, rules and regulations including setbacks to drinking water wells, water supplies, and sensitive water bodies. Proper design and installation is essential to protect public health and avert the potential adverse impacts of onsite wastewater treatment systems on water resources. Construction inspections are conducted during installation in addition to the inspections conducted by the Designer. Annually, the program undertakes approximately 2,300 suitability assessments, 5,000 permit reviews, and 11,600 inspections. Additionally, the program has developed a process for approving innovative septic system technology. As a result of 1997 revisions to the onsite wastewater treatment systems legislation, a licensing program (including training and examination) for private-sector professional designers and installers has been implemented in order to allow RIDEM staff to concentrate on major projects and proactive planning and policy development.

OWTS Rules
(eff. 7/9/12)
The Onsite Wastewater Treatment System Program has created an e-mail list to distribute information on Department policies and rule changes. You can subscribe by sending an e-mail to: majordomo@listserve.ri.gov. In the body of the message, include the following text: "subscribe owtsinfo". Leave the subject line blank. This is an announcement-only list so you will not be able to post messages to other subscribers. If you have difficulty subscribing or have other questions, email owner-owtsinfo@listserve.ri.gov.
Additional Links
New England Onsite Wastewater Training Program
USGS Water Table Information
OWTS Licensing Disciplinary Actions
Summary of R.I. Municipal Onsite Wastewater Programs

Rules and Policies
Rules Development:
Reports and Publications:
Nitrogen Loading in the Salt Ponds
USGS Salt Pond Groundwater Study
Presentations:
House Committee on Environment and Natural Resources
Washington County Regional Planning Council

Contacts:
For more permitting information E-Mail:

For more installer licensing information E-Mail:
Linda Washington (linda.washington@dem.ri.gov)

For more designer licensing information E-Mail:
Deb Knauss (deb.knauss@dem.ri.gov)

For more rules and policy information E-Mail:
Jon Zwarg (jonathan.zwarg@dem.ri.gov)


For General Information 222-6800 • After Hours Emergencies 222-3070 • Disclaimer
rev. 3/12/14