Program Requirements
Required to develop, implement and enforce a program to:
- Reduce the discharge of pollutants to the maximum extent practicable (MEP)
Six Minimum Control Measures
- Public Education and Outreach
- Public Involvement/Participation
- Illicit Discharge Detection and Elimination
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention/Good Housekeeping