|
If a construction activity infringes on a wetland, the problem activity currently needs to be removed, and an application then needs to be filed to address the wetland problem. Could the policy be changed to immediately stop the construction activity and then file an application, with the possibility that the wetland application can address the infringement of the wetland? |
Hank Ellis
Chuck Horbert
John Boehnert |
222-1360 x7401
222-6820 x7402
861-8200 |